Rising — discussed at 3 meetings since Sep 21, 2026, up from 2 in the two months before.
Public comments (152)
Called the county's map on future data center sites 'worthless,' criticized the 430-acre approval, and said residents feel unheard after the board voted down the pause motion.
Board of Commissioners - Oct 19, 2026 · 1:14:02 →Asked how the new 'secret projects' will get power given Duke transmission constraints, and asked for 45 dB limits and fines starting at $10,000 that double per violation.
Board of Commissioners - Oct 19, 2026 · 1:11:34 →Laid out six demands: refer the noise standard to the JPC, fix the $100/day fine, hold hearings on the three petitions, and get legal advice on the county's exposure.
Board of Commissioners - Oct 19, 2026 · 1:08:30 →Said the board is ignoring three legally valid petitions to rewrite the data center rules and lower the 65 dB limit; vowed residents won't give up.
Board of Commissioners - Oct 19, 2026 · 1:05:03 →Asked for a rigorous due-diligence process covering noise, lighting, landscaping and electric bills, and complained that a commissioner approached him privately about an email he sent the chair.
Board of Commissioners - Oct 19, 2026 · 1:02:12 →Called the 65 dB standard a health hazard, demanded UDO amendments now, questioned private CyrusOne meetings, and asked commissioners to raise their hands if they'd never signed an NDA.
Board of Commissioners - Oct 19, 2026 · 1:22:59 →Cited Pennsylvania counties requiring 100–125% decommissioning bonds, detailed Illinois regulations CyrusOne must meet, and requested a public accounting of Magenta Morelli cleanup costs.
Board of Commissioners - Oct 19, 2026 · 1:18:22 →Criticized the county's press release as empty monitoring language and demanded noise limits of 50 dB day/40 dB night, saying the board has lost residents' trust.
Board of Commissioners - Oct 5, 2026 · 1:23:04 →A lifelong Lower Moncure Road resident and brain tumor survivor urged commissioners to prioritize quality of life over money and jobs.
Board of Commissioners - Oct 5, 2026 · 1:26:10 →Said the county has repeatedly placed industrial uses near his Deep River home without telling residents beforehand, and asked for transparency.
Board of Commissioners - Oct 5, 2026 · 1:10:00 →Urged the board to revisit the data center approval based on due-diligence standards and criticized the 65-decibel noise limit as unacceptable for lifelong exposure.
Board of Commissioners - Oct 5, 2026 · 1:05:59 →Asked the board to direct staff to begin reviewing the data center ordinance now — setbacks, noise, water, generators — rather than waiting for the next application.
Board of Commissioners - Oct 5, 2026 · 1:28:49 →Lives 100 yards from the data center entrance; questioned who pays for Duke transmission upgrades and argued the data center consumes power that could serve job-creating manufacturers.
Board of Commissioners - Oct 5, 2026 · 1:29:01 →Cited firsthand accounts of data center harms nationwide, questioned long-term viability and decommissioning, and asked how residents' concerns can be genuinely considered.
Board of Commissioners - Oct 5, 2026 · 1:36:01 →Claimed generators were ordered two years ago, suggesting the project was decided behind closed doors, and called the project a permanent harm to the community.
Board of Commissioners - Oct 5, 2026 · 1:32:01 →Called on commissioners to update the UDO now so the next data center pays its own way and protects residents.
Board of Commissioners - Oct 5, 2026 · 1:13:36 →Said rezoning to industrial caused the problems, thanked Commissioner Reives, and asked for resident involvement, county water extension, and tax incentives for affected residents.
Board of Commissioners - Oct 5, 2026 · 1:14:00 →Pressed for a moratorium, noting large tracts could host data centers and citing ballot measures on data centers in other states.
Board of Commissioners - Oct 5, 2026 · 1:17:30 →Said she and others warned the board as far back as October 2025 and were ignored; urged the board to stop data centers.
Board of Commissioners - Oct 5, 2026 · 1:20:27 →Furious that the rezoning passed 4-3 despite opposition; demanded the county stop the project and questioned SAGA's secrecy.
Board of Commissioners - Sep 21, 2026 · 1:35:00 →A neighboring farmer described nightly noise readings, warned of ~1 gigawatt power demand and 125,000 gallons/day water use, and demanded a data center moratorium.
Board of Commissioners - Sep 21, 2026 · 1:31:57 →Used a 'seven blind mice' parable to argue the board is seeing the data center piecemeal; demanded a legally sound 180-day moratorium.
Board of Commissioners - Sep 21, 2026 · 1:38:22 →A young resident questioned Cyrus One's closed-loop cooling, chemical disposal, gas generator use, sound barriers, and the low job count.
Board of Commissioners - Sep 21, 2026 · 1:41:22 →Thanked Officer Eldridge for 18 years of service, then asked again for a data center moratorium and UDO review.
Board of Commissioners - Sep 21, 2026 · 1:44:18 →Said twice-passed moratorium motions were 'sabotaged' by staff, asked who runs the county, and urged the board to pass the moratorium itself.
Board of Commissioners - Sep 21, 2026 · 1:47:55 →Asked commissioners to create a way for residents to help — funds, expertise, letters — outside the public-comment format.
Board of Commissioners - Sep 21, 2026 · 1:50:39 →Quoted the county's own strategic plan values and asked commissioners to live up to them on the data center issue.
Board of Commissioners - Sep 21, 2026 · 1:53:02 →Made a specific ask: an immediate temporary moratorium while the county develops data-center-specific standards for water, noise, setbacks, and power.
Board of Commissioners - Sep 21, 2026 · 1:55:10 →Wearing her father's 1952 Deep River letterman jacket, demanded the moratorium now and criticized the 75% countryside-to-light-industrial rezoning.
Board of Commissioners - Sep 21, 2026 · 1:58:03 →A third-generation farmer delivered an emotional, profanity-laced rebuke, telling the board to stop the data center now and directing frustration at individual commissioners before being called to order.
Board of Commissioners - Aug 17, 2026 · 1:04:01 →Asked why the county is rushing, and laid out specific UDO fixes: raise the $100/day fine to $10,000/day, require independent noise monitoring, reconsider the 500-foot buffer, and require decommissioning bonds.
Board of Commissioners - Aug 17, 2026 · 54:31 →A farmer whose property borders the Helix site said the project was sold as light industrial, urged reclassifying data centers to heavy industrial, and noted full build-out would use more power than Harris Lake produces.
Board of Commissioners - Aug 17, 2026 · 57:46 →Focused on wildlife and livestock: dogs hear 20 dB lower than humans, and she asked whether the board is prepared to take responsibility for income losses to farmers whose animals suffer from constant noise.
Board of Commissioners - Aug 17, 2026 · 1:01:07 →A finance professional argued the public was sold a light industrial park, not a 90-megawatt data center; the rezoning was general-use so no promises are enforceable, and she asked for independent verification of tax, water, noise, and power claims.
Board of Commissioners - Aug 17, 2026 · 1:06:09 →A CCCC student argued the $1 million in projected tax revenue works out to about $14 per resident, questioned Cyrus One's sustainability record at other sites, and challenged the 40-job projection.
Board of Commissioners - Aug 17, 2026 · 57:29 →Asked why the rush and why a data center at all, citing secrecy, closed-door meetings, and the loss of 130 acres of land, forest, and wildlife.
Board of Commissioners - Aug 17, 2026 · 1:16:47 →Presented technical UDO amendment proposals, arguing the A-weighted noise standard hides low-frequency sound and asking for linear (C-weighted) measurement, referral to the planning commission, and a temporary moratorium.
Board of Commissioners - Aug 17, 2026 · 1:20:17 →Thanked Chairman Martin and Commissioner Reives for reaching out, but accused former leadership of secretly coordinating the data center while residents fought rumors, and asked staff to amend the UDO for low-frequency noise.
Board of Commissioners - Aug 17, 2026 · 1:22:57 →Said she's asked for a moratorium for months, referenced a reported commissioner text calling the crowd 'the mob,' and said weak UDO protections and secrecy have created mistrust.
Board of Commissioners - Aug 17, 2026 · 1:26:56 →Kept it short: residents on Lower Moncure Road are losing sleep because the board denied a basic review request, and she asked how the board sleeps at night.
Board of Commissioners - Aug 17, 2026 · 1:28:08 →An 81-year Lee's Chapel Road farming family representative said the county rubber-stamps everything, noted rural areas have been denied water for years while the data center would get it, and asked who has the backbone to stop the project.
Board of Commissioners - Aug 17, 2026 · 1:30:06 →Said the data center process broke her trust in local government and asked whether the board will be emboldened to act the same way on the next big project.
Board of Commissioners - Aug 17, 2026 · 1:33:57 →Said her family hasn't slept since June 8, read a long list of NC towns and counties that adopted moratoriums, called the board's legislative resolution inadequate, and demanded local action now.
Board of Commissioners - Aug 17, 2026 · 1:36:01 →Distributed documents with twelve questions and a source sheet, asked who signed NDAs and when, and urged an immediate moratorium: stop, study, disclose, listen, then decide.
Board of Commissioners - Aug 17, 2026 · 1:42:38 →Criticized the SAGA economic development recruitment process as flawed, noted a lawsuit against Cyrus One elsewhere, and asked for an emergency moratorium while the application is still under review.
Board of Commissioners - Aug 17, 2026 · 1:46:30 →Asked what kind of growth the board is choosing, noted no resident has ever spoken in favor of the data center, and cited the 90 megawatts as roughly the demand of 75,000 homes — tripling the county's electric need.
Board of Commissioners - Aug 17, 2026 · 1:49:10 →Cited water crises in Virginia and Georgia, warned that the proposed Enbridge fracked-gas pipeline to power the data center would cross Chatham County farms and the Deep River, and asked for a moratorium.
Board of Commissioners - Aug 17, 2026 · 1:52:40 →A recording engineer measured 57 dB of ambient background at the site perimeter, leaving only 9 dB of headroom under the 65 dB limit, and pressed the board on how the noise ordinance will be enforced.
Board of Commissioners - Aug 17, 2026 · 1:55:45 →The NAACP president said passing the UDO should begin accountability, not end it; with up to $7 billion in investment, every commitment should be enforceable — and asked for data justifying the removal of Sunday voting.
Board of Commissioners - Aug 17, 2026 · 1:59:13 →A Moncure resident said she'll boycott Lower Moncure Road if the project proceeds, citing noise, light pollution, Central Electric power costs, groundwater, and the threat to farms and wildlife.
Board of Commissioners - Aug 17, 2026 · 2:02:45 →Said his house lights already flicker daily, questioned whether the grid can handle another data center, and called any NDA signed by a board member a complete abdication of public service.
Board of Commissioners - Aug 17, 2026 · 2:06:28 →Cited a study of 6,000 data centers showing surface temperature increases up to 16.5°F within a 6.5-mile radius, and said her elderly mother lives less than five miles from the site.
Board of Commissioners - Aug 17, 2026 · 2:08:34 →A Lee County educator asked for a pause on new data centers, citing unknown environmental effects, a strained power grid, and concerns raised by his own students.
Board of Commissioners - Aug 17, 2026 · 47:01 →A 50-year resident warned that growth-at-all-costs planning will double the population by 2050 without doubling schools and infrastructure, and asked the board to open each meeting by asking what it's doing for quality of life.
Board of Commissioners - Aug 17, 2026 · 49:23 →Told the board she can live without a data center but not without clean water, clean air, and affordable electric bills, and asked them to show residents they were trusted correctly.
Board of Commissioners - Aug 17, 2026 · 53:24 →Compared the situation to the 2014-15 coal ash fight, describing a playbook of targeting uninformed communities and urging the county to say no.
Board of Commissioners - Jul 13, 2026 · 1:32:39 →A veteran of the successful anti-co-ash campaign, she praised the crowd's activism and expressed confidence data centers can be stopped.
Board of Commissioners - Jul 13, 2026 · 1:35:13 →Said hundreds have asked for a moratorium over the past year and quoted Proverbs about shutting ears to the cry of the poor.
Board of Commissioners - Jul 13, 2026 · 1:37:25 →Said the developers lied, cheated with NDAs, and are stealing the community's peace and quiet, and asked for a moratorium.
Board of Commissioners - Jul 13, 2026 · 1:38:31 →The final commenter asked the county to adopt the strongest possible UDO protections for water, environment, and fixed-income residents regardless of the project's fate.
Board of Commissioners - Jul 13, 2026 · 1:41:08 →Described infrasound's physiological effects on humans and animals and urged commissioners to consider the long-term consequences.
Board of Commissioners - Jul 13, 2026 · 59:50 →Detailed the developer's track record in Virginia — no built hyperscale centers, pressure tactics, and revised permit requests — and questioned the noise study's generator assumptions.
Board of Commissioners - Jul 13, 2026 · 1:17:30 →Speaking for the third time, said the board hasn't been listening, called data centers the next bust, and renewed his call for a moratorium.
Board of Commissioners - Jul 13, 2026 · 57:44 →A lifelong resident warned that low-frequency infrasound from data centers can't be stopped by walls or distance and can cause health effects, and urged responsible development.
Board of Commissioners - Jul 13, 2026 · 54:30 →A business owner and former teacher warned of resource strain and asked the board to vote on a moratorium, saying she's disturbed by the secrecy.
Board of Commissioners - Jul 13, 2026 · 51:33 →Asked commissioners to put residents first, questioning electricity and water use, taxpayer costs, and secrecy, and urged a no vote.
Board of Commissioners - Jul 13, 2026 · 47:06 →A repeat speaker since August, she questioned the scale of the hyperscale campus versus what was originally touted, cited CyrusOne citations and lawsuits, and asked for a moratorium.
Board of Commissioners - Jul 13, 2026 · 1:29:05 →A computer science student raised concerns about a projected 7.6 GW energy demand increase and potential 18% power bill increases for North Carolina residents.
Board of Commissioners - Jul 13, 2026 · 43:41 →Said the developer promised a quiet business park with 500 jobs but is now building a 430-acre data center campus with a 90-megawatt draw and only 40 permanent jobs, and urged the companies to withdraw.
Board of Commissioners - Jul 13, 2026 · 39:23 →A Monkey (Chatham County) resident urged the public to look at online petitions, arguing the pipeline and utility needs tie the data center question to regional energy politics.
Board of Commissioners - Jul 13, 2026 · 37:51 →A local veterinarian cited research on noise effects on livestock and wildlife, diesel generator decibel levels, and a Cambridge study on data center heat islands.
Board of Commissioners - Jul 13, 2026 · 1:25:01 →A USDA-registered farmer whose property is surrounded by the project said he's documenting sound levels daily and warned of CyrusOne's noise complaints and litigation elsewhere.
Board of Commissioners - Jul 13, 2026 · 1:21:54 →Said the company hasn't been truthful and, drawing on her father's toxic-waste cleanup career, urged the county to require upfront cleanup funds in trust before construction.
Board of Commissioners - Jul 13, 2026 · 1:15:30 →Argued making data centers a permitted use stripped residents of future public hearings and elevated corporate property rights over homeowners' rights.
Board of Commissioners - Jul 13, 2026 · 1:11:59 →Asked pointed questions about the likelihood of construction and cybersecurity oversight, noting $900 million in backing and foreign data-handling concerns.
Board of Commissioners - Jul 13, 2026 · 1:08:30 →A Lower Moncure Road resident said the community was misled about the rezoning and urged commissioners not to approve data centers near homes.
Board of Commissioners - Jul 13, 2026 · 1:06:58 →Argued infrasound penetrates walls and standard zoning setbacks won't help, and demanded a moratorium with proper multi-weighted sound measurement.
Board of Commissioners - Jul 13, 2026 · 1:03:34 →Raised concerns about whether county fire departments are prepared for lithium battery fires at the proposed data center, citing her Ohio experience where a data center fire burned over 30 hours and caused $450 million in damages.
Board of Commissioners - Jun 29, 2026 · 12:04 →Said he's speaking up for his neighbors and vulnerable residents even though the project wouldn't directly affect his end of town.
Board of Commissioners - Jun 15, 2026 · 1:21:17 →Asked whether the board will form an independent citizen committee of scientists to study communities that already host data centers.
Board of Commissioners - Jun 15, 2026 · 1:23:04 →Questioned whether the review process fits a $900 million project, asking whether the county has the fire, hazmat, and emergency capacity for a worst-case event.
Board of Commissioners - Jun 15, 2026 · 1:31:06 →Cited Google's Oregon data center consuming a third of a city's water and argued a facility using power equal to 100,000 homes doesn't belong in light industrial.
Board of Commissioners - Jun 15, 2026 · 1:34:00 →Mother of a disabled child living in Deep River; asked the board to consider families like hers who depend on local hospitals and schools when weighing the data center.
Board of Commissioners - Jun 15, 2026 · 1:36:33 →Listed unaddressed questions — e-waste, CO2 emissions, water discharge, runoff — and asked for a moratorium and a new zoning classification for data centers.
Board of Commissioners - Jun 15, 2026 · 1:16:31 →Lives under two miles from the site; questioned how a data center qualifies as 'light' industrial given 65-85 dB noise levels and heat output.
Board of Commissioners - Jun 15, 2026 · 1:13:02 →Retired federal attorney; submitted a petition with about 600 signatures and argued a planning board member's changed position proves material confusion justifying a moratorium.
Board of Commissioners - Jun 15, 2026 · 1:06:10 →Said residents don't want or need a data center and don't want their rural way of life and health sold to the highest bidder.
Board of Commissioners - Jun 15, 2026 · 1:01:36 →Raised transparency concerns: out-of-state consultants who supported the UDO amendments had worked on the proposed project without disclosing it.
Board of Commissioners - Jun 15, 2026 · 57:38 →Said constituents 'got played' on the moratorium vote and threatened legal action if a permit is granted.
Board of Commissioners - Jun 15, 2026 · 55:02 →Questioned what the county gains from a $900 million project with only about 50 jobs, and worried about his inherited land's value and water use.
Board of Commissioners - Jun 15, 2026 · 53:01 →Lives across from the proposed substation; played a recording of the expected noise and asked for a moratorium.
Board of Commissioners - Jun 15, 2026 · 39:48 →Father of three living near the site; raised health concerns about infrasound and EMF exposure, citing his son's seizures from a smart meter.
Board of Commissioners - Jun 15, 2026 · 45:04 →Demanded the board reject data center development and enact a moratorium, saying the community has spoken clearly against it.
Board of Commissioners - Jun 15, 2026 · 40:39 →Argued a much larger operator than Deep River Data is eyeing the county, citing a $5 billion figure and the pivot from moratorium to UDO amendments; asked commissioners to pledge no NDAs.
Board of Commissioners - May 18, 2026 · 58:44 →Renewed his call for a moratorium on drilling, fracking, and data centers, calling the draft UDO standards 'insultingly weak' and criticizing SAGA's credibility.
Board of Commissioners - May 18, 2026 · 55:49 →Called for civility on the board, thanked residents who keep showing up, and urged updating the UDO on data centers before it's too late.
Board of Commissioners - May 18, 2026 · 53:56 →Spoke in support, comparing data centers to past transformative technologies like railroads and the internet, and said the standards protect the community.
Board of Commissioners - Apr 20, 2026 · 1:18:31 →An economic development advocate spoke in support of the data center ordinance, saying it creates tax revenue without straining schools or roads and keeps decision-making local.
Board of Commissioners - Apr 20, 2026 · 56:34 →A Lower Monkey Road resident strongly opposed the data center, warning about fracking, aquifer contamination, water use, noise, and grid strain, and urged the county to make rules so restrictive the project can't come in.
Board of Commissioners - Apr 20, 2026 · 58:52 →Opposed the UDO, said he called a Virginia anti-data-center coalition leader, warned of rising electric bills, and urged a one-year moratorium.
Board of Commissioners - Apr 20, 2026 · 3:31:02 →A Blue Ridge Environmental Defense League advocate opposed the UDO, urged a decommissioning bond, warned against fracking 'synergy,' and quoted Jurassic Park on acting before thinking.
Board of Commissioners - Apr 20, 2026 · 1:09:56 →An Angel Road resident who's been attending since October opposed the UDO, citing city council concerns about the 500-foot buffer, the lowered fine, e-waste, and asking where the rumored $5 billion data center is.
Board of Commissioners - Apr 20, 2026 · 1:21:02 →A mechanical engineer from upstate New York specializing in data center cooling supported the ordinance, explaining that modern closed-loop air-cooled systems use almost no water and don't discharge harmful wastewater.
Board of Commissioners - Apr 20, 2026 · 1:24:56 →An acoustical consultant from Dallas working in data centers supported the UDO, saying data center noise is predictable and the ordinance's noise limits and enforcement protocols are well designed.
Board of Commissioners - Apr 20, 2026 · 1:29:25 →A Florida environmental engineer supporting the UDO said data centers produce far less hazardous waste than typical industry and abandoned sites would likely be repurposed, not left as blight.
Board of Commissioners - Apr 20, 2026 · 1:33:51 →A Sanford resident opposed the UDO in its current state, saying responsibility between utilities, the data center, the county, and the city still needs clarification.
Board of Commissioners - Apr 20, 2026 · 1:39:37 →Opposed the UDO citing loopholes, questioned why SAGA brought experts after calling the project a bad fit, and pressed for a moratorium over water, power, and tax-exemption worries.
Board of Commissioners - Apr 20, 2026 · 1:40:03 →Opposed the UDO as written but supportive of the concept, said the substantive limits (decibels, Duke Energy power requirement) are sound, and urged a moratorium to verify it's the best the county can legally do.
Board of Commissioners - Apr 20, 2026 · 1:45:17 →A Sanford resident and former anti-landfill activist opposed the UDO, demanded a 12-month moratorium, called the $100/day penalty 'ludicrous,' and accused the process of being rushed and predetermined.
Board of Commissioners - Apr 20, 2026 · 1:47:47 →The CEO of Central Electric Membership Cooperative supported the UDO, explaining that large-load customers pay upfront for their own substations and infrastructure so existing members' rates aren't affected.
Board of Commissioners - Apr 20, 2026 · 1:55:10 →A data center policy expert from Atlanta supporting the UDO said Lee County's framework is ahead of most of the Southeast and stressed data centers aren't extractive industries — AI is only 10% of their energy use.
Board of Commissioners - Apr 20, 2026 · 2:14:38 →The Deep River Riverkeeper supported rules in principle but argued for a moratorium first, warning that the county's water system can't treat synthetic chemicals like PFOS until 2029 while a data center could be built in 18 months.
Board of Commissioners - Apr 20, 2026 · 2:20:49 →The SAGA president, visibly emotional, defended the experts he invited, said SAGA does not support fracking, detailed the ordinance's protections, and stressed that data centers already operate across North Carolina.
Board of Commissioners - Apr 20, 2026 · 2:26:56 →A resident who arrived late asked the SAGA experts pointed questions — what's positive about a data center in your backyard, and do closed-loop systems ever need flushing — and concluded a moratorium is still needed.
Board of Commissioners - Apr 20, 2026 · 2:43:01 →Asked where the reported $5 billion data center investment figure came from, since Deep River Data reportedly doesn't have pockets that deep.
Board of Commissioners - Apr 20, 2026 · 3:33:39 →A local business owner and Chatham County landowner 1.8 miles from the Butler No. 3 well asked for a moratorium, and shared a family EMS story urging the board not to pick the lowest bidder.
Board of Commissioners - Apr 20, 2026 · 3:34:39 →A licensed plumber and well contractor educated the Board on well and water risks, noting county water in Harnett also comes from wells.
Board of Commissioners - Mar 16, 2026 · 2:02:41 →A Clean Water for North Carolina staffer presented a report on the AI data center business model, said residents already pay higher bills for Microsoft's data centers, and endorsed a moratorium.
Board of Commissioners - Mar 16, 2026 · 2:05:16 →A taxpayer and voter who came simply to support a moratorium on fracking and data centers.
Board of Commissioners - Mar 16, 2026 · 2:09:37 →Asked the Board, City Council, and SAGA to prohibit NDAs in data center deals, cited Moore County's two-year moratorium, and urged the county to be selective about industry.
Board of Commissioners - Mar 16, 2026 · 2:09:56 →A nearly 36-year Sanford resident raising four daughters here asked for a moratorium until the county understands what it's approving.
Board of Commissioners - Mar 16, 2026 · 2:13:37 →Compared data centers to a landfill fight he helped win, citing unusable land footprints, few jobs, and health risks; demanded a moratorium and accountability at the ballot box.
Board of Commissioners - Mar 16, 2026 · 2:15:05 →Reminded the Board their decisions affect current and future generations.
Board of Commissioners - Mar 16, 2026 · 1:45:56 →A Deep River resident with a small farm and a child with asthma urged a moratorium, citing risks to wells, groundwater, air, and summer water shortages.
Board of Commissioners - Mar 16, 2026 · 1:29:19 →An attorney, Army veteran, and Jonesboro business owner noted no hands were raised in support of the data center and warned of contaminated water outcomes seen in the Cape Fear Basin.
Board of Commissioners - Mar 16, 2026 · 1:31:21 →Urged slowing down and gathering facts, saying 'a rush to judgment is a rush to regret' and that a moratorium makes sense.
Board of Commissioners - Mar 16, 2026 · 1:34:24 →A Republican from Cumnock Road sharply criticized the Board's inaction and Chairman Smith by name, urging the minority commissioners to act.
Board of Commissioners - Mar 16, 2026 · 1:37:22 →Said the current proposal is under-regulated and supported a moratorium of at least two years to put guardrails in place.
Board of Commissioners - Mar 16, 2026 · 1:39:51 →Warned the Cumnock area sits over unmapped old coal mines and recalled past textile pollution, urging the Board to protect residents.
Board of Commissioners - Mar 16, 2026 · 1:43:30 →A conservative well-water resident and hunter on the Deep River said data centers create few jobs and predicted the company would exhaust resources and file bankruptcy; urged a moratorium.
Board of Commissioners - Mar 16, 2026 · 1:46:57 →A retired hospice social worker spoke about regret and responsibility, supporting a moratorium and opposing both fracking and data centers.
Board of Commissioners - Mar 16, 2026 · 1:49:33 →A medical professional who places dialysis catheters described patients with heavy-metal kidney failure and cited fracking health research; asked for a moratorium to study the capped Butler well site.
Board of Commissioners - Mar 16, 2026 · 1:52:49 →An NC State emeritus professor who chose Sanford five years ago asked the Board to delay the data center via moratorium, noting many residents couldn't attend.
Board of Commissioners - Mar 16, 2026 · 1:55:32 →An Army veteran with tinnitus described permanent noise pollution harms near data centers and urged a moratorium to set sound standards first.
Board of Commissioners - Mar 16, 2026 · 1:57:45 →Cited a Brookings Institution article urging regions to slow down and get the right standards in place before deciding.
Board of Commissioners - Mar 16, 2026 · 2:01:32 →The Deep River riverkeeper raised concerns about PFOS and dioxin pollution already in the river, which supplies drinking water to about 50,000 people, and opposed a data center next to the new 421 river access site.
Board of Commissioners - Feb 16, 2026 · 1:10:36 →Toxic Free NC's organizing director urged moratoria on fracking, drilling, and data centers, noting Deep River Data would be the first commercial well in the Triassic Basin and citing the 1925 Coal Glen mine disaster.
Board of Commissioners - Feb 16, 2026 · 1:13:59 →Cited data centers' massive water use (5 million gallons/day) and criticized Chairman Smith for demeaning citizens who disagree with him.
Board of Commissioners - Feb 16, 2026 · 1:17:21 →Asked for a moratorium and a legal-options presentation, citing utility cost spikes, noise, health risks, and instability in the AI and crypto industries elsewhere.
Board of Commissioners - Feb 16, 2026 · 1:21:14 →Asked why the board voted quickly on the Dream Center but won't vote on a moratorium residents have requested for months, and urged a public vote to join Chatham County's ban.
Board of Commissioners - Feb 16, 2026 · 54:41 →Reported the state geologist expects a Deep River Data drilling application and urged a moratorium, noting other counties have acted; also criticized dismissive responses from a commissioner.
Board of Commissioners - Feb 16, 2026 · 57:02 →Third time speaking on the issue; asked why no moratorium has been placed and requested a public vote and an agenda item on the topic.
Board of Commissioners - Feb 16, 2026 · 1:00:04 →A software engineer who argued data centers bring few local jobs and drive away tech talent, and asked for a moratorium and a SELC presentation on the county's regulatory options.
Board of Commissioners - Feb 16, 2026 · 1:01:08 →A retired teacher who criticized the board for denying environmental groups agenda time, and highlighted the Cape Fear River's role as a drinking water source downstream.
Board of Commissioners - Feb 16, 2026 · 1:03:48 →A retired school speech therapist and outdoor enthusiast who called it a quality-of-life, environmental, and wildlife issue and asked for a SELC presentation.
Board of Commissioners - Feb 16, 2026 · 1:07:05 →Urged a moratorium to protect water, air, and soil, citing Chatham County's 12-month ban, and asked for a SELC presentation with a public vote.
Board of Commissioners - Feb 16, 2026 · 1:08:40 →Clean Water for NC staffer confirmed no application has been filed yet, called the situation a 'gift of time,' and urged a temporary moratorium now while the county has the most legal latitude.
Board of Commissioners - Jan 5, 2026 · 41:56 →Delivered an impassioned, at times inflammatory critique — calling the project a Bitcoin scheme, invoking the coal ash history, and pointedly challenging Chairman Smith over press comments; the chairman cut him off and denied any impropriety.
Board of Commissioners - Jan 5, 2026 · 57:09 →Asked the board to enact a moratorium before any application arrives, citing cancer-cluster concerns from other fracking regions and unknown AI influence.
Board of Commissioners - Jan 5, 2026 · 1:01:18 →Argued the AI bubble is deflating, making the data center economically unviable, and warned fracking would crater land values and force tax hikes or school cuts.
Board of Commissioners - Jan 5, 2026 · 28:40 →Asked the board to enact a moratorium on fracking, drilling, and any AI data center to gain breathing room and follow the science.
Board of Commissioners - Jan 5, 2026 · 40:08 →Warned from experience in rural Southern communities that one big economic tragedy can leave a rural town in permanent ruin, and opposed a rushed decision.
Board of Commissioners - Jan 5, 2026 · 45:27 →